摘要(Abstract):
随着我国"规划纲要草案"的出台,能源行业市场化改革被提上了重要议程,其终极目标为实现市场调控与国家监管的有机结合。鉴于体系化的能源市场法律规则是能源行业全面引入市场机制的重要理论依据,而市场的基本构造离不开市场参与者、市场交易对象以及市场交易规则等核心要素,因此,以我国现有能源市场之法律与实践状况为研究基础,本文从能源市场主体、客体、交易规则三方面入手,分别探讨相应的制度,以完成对我国能源市场法律规则的整体构建。
关键词(KeyWords):
Abstract:
Keywords:
基金项目(Foundation):
作者(Author): 侯东德;郑佳宁;
Email:
参考文献(References):
- (1)LYU ZHENYONG,INTRODUCTION OF ENERGY LAW,at 9-10(China Electric Power Press,2014).
- (2)RESEARCH GROUP ON ENVIRONMENTAL RESOURCES AND ENERGY LAW RESEARCH CENTER OF TSINGHUAUNIVERSITY,EXPERT RECOMMENDATIONS AND EXPLANATIONS ON CHINESE ENERGY LAW(DRAFT VERSION),at54-56(Tsinghua University Press,2008).
- (3)Gao Wei,The Ministry of Land and Resources:The Third Round of Shale Gas Bidding in the Near Future,Economic Information Daily,September 18,2014,at 003.
- (4)As to determining the scope of the mining areas,in the areas where the state-owned mining enterprises and other mining subjects are both entitled to mine,the mining areas of other mining subjects should not be determined until the mining areas of the state-owned mining enterprises have been ratified or determined.See CUI JIANYUAN,AN ANALYSIS INTO QUASI-REAL RIGHTS,at 250(Law Press China,2012).
- (5)The exploration and exploitation activities,as upstream activities,are still“privileged”industries in that only the enterprises granted with the licenses for exploration right of mining and exploitation right of mining by the Ministry of Land and Resources of the People’s Republic of China are entitled to engage in exploration and exploitation.At present,few oil enterprises have been granted accordingly,among which are state-owned capital such as China National Petroleum Corporation,China Petrochemical Corporation,and China National Offshore Oil Corporation.See HUANG ZHENZHONG,ZHAO QIUYAN&TAN BAIPING,CHINAENERGY LAW,at 197(Law Press China,2009).
- (6)SHI JICHUN,ECONOMIC LAW(THE 3RD EDITION),at 163-164(China Renmin University Press,2015).
- (7)Liu Hairong&Xiao Lingzhi,The Development of Small and Medium Hydropower in Yunnan Asks for Competent Political Department,Yunnan Electric Power News,November 16,2007.
- (8)The BP Statistical Review of World Energy 2015.
- (9)Articles 3 and 15 of the Mineral Resources Law of the People’s Republic of China..
- (10)Article 16 of the Regulation for Registering to Explore for Mineral Resources Using the Block System.
- (11)Article 13 of the Procedures for Administration of Registration of Mining of Mineral Resources.
- (12)Liu Guanghua&Xue Jianwei,On Issues Related to the Acquisition and Transition of China’s Mineral Property Rights,2009 NationalConference on Environmental Resources Jurisprudence(Annual Meeting),August 3,2009,at 1097.
- (13)For example,where the holders of the exploration right of mining apply in accordance with the laws for the exploitation right of mining within the scope of the areas for exploration;where the continuing mining areas of a mine enterprise conforms to the planning of mineral resources or overall planning of the mining area,or the upper and lower parts of the mining area attached with the mining right needs to be uniformly mined;where it provides building minerals for the key infrastructure construction projects of the State;where the ownership of the exploration right of mining or the exploitation right of mining is in dispute and so on.See article 10 of the Measures for the Administration of Invitation to Bid,Auction,and Quotation concerning Mineral Prospecting Right and Mining Right(for TrialImplementation).
- (14)Guo Liwei&Shen Manhong,Review of Studies on the Development of Renewable Energy Industry,7 Inquiry into Economic Issues123 ,124(2012).
- (15)Article 13 of the Renewable Energy Law of the People’s Republic of China.
- (16)LI YONGNING,LI JIHE&HAN LILIN,ENVIRONMENTAL&NATURAL RESOURCES LAW,at 111(China University of Political Science and Law Press,2012).
- (17)Article 20 of the Water Pollution Prevention and Control Law of the People’s Republic of China;article 19 of the Atmospheric Pollution Prevention and Control Law of the People’s Republic of China.
- (18)Articles 4-16 of the Interim Provisions for the Administration of Pollutant Discharge License(Consultation Paper).
- (19)Zheng Jianing,Construction of the Legal System of Energy and Property Transaction in China,14 Commercial Times 121(2014).
- (20)CUI JIANYUAN,PROPERTY LAW,THE 3RD EDITION,at 17(China Renmin University Press,2014).
- (21)WANG WEIGUO,CIVIL LAW,at 164(China University of Political Science and Law Press,2012).
- (22)WANG ZEJIAN,PROPERTY RIGHTS IN SCOPE OF CIVIL LAW,at 41(Peking University Press,2010).
- (23)THE MINISTRY OF LAND AND RESOURCES,NATIONAL PETROLEUM AND NATURAL GAS RESOURCES EXPLORATIONAND EXPLOITATION IN 2015,at http://www.mlr.gov.cn/zwgk/zytz/201607/t20160707_1411047.htm(Last visited on August 3,2016).
- (24)Gong Gu,Restatement of State Ownership of Natural Resources,2 Chinese Journal of Law 125(2015).
- (25)Supra note 5,144.
- (26)NATIONAL ENERGY ADMINISTRATION,STATISTICS OF PHOTOVOLTAIC POWER GENERATION IN 2015,at http://www.nea.gov.cn/2016-02/05/c_135076636.htm(Last visited on August 3,2016).
- (27)NATIONAL ENERGY ADMINISTRATION,DEVELOPMENT OF WIND POWER INDUSTRY IN 2015,at http://www.nea.gov.cn/2016-02/02/c_135066586.htm(Last visited on August 3,2016).
- (28)Li Xiandong&Liu Zhiqiang,On Legal Nature of Mining Right,2 Contemporary Law Review 104(2009).
- (29)Shi Jangshui,Analysis on the Path of Right Privatization in Mineral Resources Lawmaking,3 Hebei Law Science 110(2012).
- (30)Wang Yuhong&Li Rong,The Legal Nature of the Emission Rights,12 Journal of Law Application 112(2012).
- (31)Deng Haifeng,The Quasi-Real Right Nature of Environmental Capacity and the Constitution of Its Rights,4 Chinese Legal Science 64(2005).
- (32)Wang Xiaolong,On the Nature of Emission Rights,3 Journal of Gansu Political Science and Law Institute 65(2009).
- (33)Wang Chao&Jiang Ruiyun,The Civil Law Process of Environmental Capacity,9 Hebei Law Science 138(2010).
- (34)Huang Benxiao,Liu Chenghua&Li Mei,An Analysis of the Feasibility of Establishing Oil Futures Market in China,24 CommercialEconomy Studies 9(2005).
- (35)Wang Jiali,China Coal Futures Trading Mode Development and Prospect,8 Energy 83(2014).
- (36)SHANGHAI FUTURES EXCHANGE,at http://www.shfe.com.cn/(Last visited on August 3,2016).
- (37)Peng Li&Peng Lan,On the Feasibility of the Development of China Electric Power Futures Market,21 Guide of Sci-tech Magazine59(2013).
- (38)Article 3 of the Shanghai Futures Exchange Detailed Rules for the Delivery of Fuel Oil Futures(for Trial Implementation).
- (39)Wu Zhongqun,The Non-Storage Nature of Power and Power Futures Market Failure:Causes and Mechanism,10 Finance&TradeEconomics 113(2011).
- (40)Article 3 of the Mineral Resources Law of the People’s Republic of China of 1986.
- (41)Article 6 of the Mineral Resources Law of the People’s Republic of China of 1996.
- (42)Articles 40,49 and 57 of the Interim Provisions on the Administration of the Assignment or Transfer of Mining Rights.
- (43)Article 4 of the Mineral Right Trading Rules(for Trial Implementation).
- (44)Articles 5 and 6 of the Measures for the Administration of Transfer of Mineral Exploration Right and Mining Right.
- (45)Article 9 of the Heilongjiang Management Measures for the Transaction of SO2 Emission Rights(for Trial Implementation).
- (46)Articles 180 and 188 of the Property Law of the People’s Republic of China.
- (47)Articles 181 and 189 of the Property Law of the People’s Republic of China.
- (48)CHINA CARBON EMISSIONS TRADING DATE:EMISSION RIGHTS MORTGAGE BECOMES THE MOST POPULARFINANCING METHOD FOR PRINTING AND DYEING ENTERPRISES,at http://www.tanpaifang.com/tanjinrong/2014/1206/40616.html(Last visited on August 4,2016).
- (49)Li Yuheng,The Mortgage Amount of the Mining Right of Inner Mongolia Reaches 166.1 Billion Yuan,China Land and Resources News,December 18,2015,at 01.
- (50)Article 179 of the Property Law of the People’s Republic of China;article 58 of the Interim Provisions on the Administration of theAssignment or Transfer of Mining Rights.
- (51)Article 49 of the Interim Provisions on the Administration of the Assignment or Transfer of Mining Rights.
- (52)Articles 5 and 6 of the Measures for the Administration of Transfer of Mineral Exploration Right and Mining Right.
- (53)Chang Mucheng,The City Has Completed the Initial Emission Rights Leasing Trade,Zhoushan Daily,July 25,2016,at 8.
- (54)BERNDRüTHERS,JURISPRUDENCE,at 39-40(Ding Xiaochun&Wu Yue trans.,Law Press China,2013).